671 Chapel St Sth Yarra


Grollo Secures Approval for South Yarra Project

The site located at 671 Chapel Street and 1 Forrest Hill in South Yarra has undergone numerous planning revisions and amendments over the years.

Grollo purchased the 2,069-square-meter site in 2022 for $37.5 million, as indicated by CoreLogic property data, which shows the property changed hands in December 2021 and officially settled in March 2022.

The previous owner, fashion brand owner Harry Goles, had proposed plans for a 32-story mixed-use tower. However, Grollo’s GFM Investments Group initially filed plans for a 25-story tower, later scaling it back to 22 stories.

We supported the residents in this case arguing for further reductions to ensure the tower would harmonize visually with Melbourne High School and to assess concerns about overshadowing.

The Victorian Civil and Administrative Tribunal (VCAT) inquiry consisted of two hearings, the second of which stretched over ten demanding days. Ultimately, the residents achieved a modest victory, with the tower’s height reduced from 22 to 18 stories.

Following this decision, the design and fit-out of the building may be adjusted to enhance the project’s profitability.

This report has been prepared for the residents of Chapel St South Yarra, as part of request for Further Advice notice (the notice) Stonnington (Council) and must not be copied or used by any other entity.

I, Timothy John Kirkhope, am employed by VizImpact, working under contract for Metaluxe.

 For the past 21 years, I have worked in the design industry in Australia and UK in commercial architecture, housing, product design, and FMCG. 

 The architectural projects cover a wide variety of large-scale, mixed-use, masterplan, public spaces, infrastructure, and community projects. The majority of my employment history in architectural visualization was involved in the design, development, and planning of applications, as shown on the ‘homepage’ and listed in the curriculum vitae section in ‘about’ on the company website.

 I have spent the majority of the past 18 years working alongside architects and designers for exterior, interior, landscape, town, and environmental planning. I obtained a thorough understanding of the development process. My experience prior to the industry adoption of 3D technologies gave me a more integral role in many different design teams.

 I am an expert in masterplan project visualisations, and I'm in charge of creating photorealistic visualisations for our development projects. This comprises real-time environments with interactivity, 360 image and animation, photogrammetry scene production, and static or animated photomontages for visual impact assessments.

 My architectural visualisation experience includes work for large-scale architecture and design teams such as BatesSmart, Hassell, ARM Architecture, WoodsBaggot, Aesop, Unispace, EPC Pacific, Fender Katsilidis.

I have reviewed and understood the provisions regarding expert witnesses as set out in the Planning and Environmental Court Rules 2018 and the Uniform Civil Procedure Rules 1999. I have conducted all necessary inquiries that I consider appropriate. I agree to adhere to the code of conduct and recognize my responsibilities as an expert to the Planning & Environment Court, confirming that I have fulfilled those responsibilities. To the best of my knowledge, I have disclosed all significant matters related to the project to the court, and the factual information in my report is accurate to the best of my knowledge.

The photomontage process commenced with the architectural CAD model created by the project architect. This model was generated using BIM drafting software and served as the basis for the revised architectural documentation. For camera setup, shading, and rendering, the CAD model was imported into Autodesk 3D Studio Max.

Photomontage is a technique that integrates images of a potential development site with 3D renders to create a photo-realistic representation. Cutting-edge software and technology are utilized to produce realistic images that depict the development within its actual context.

 

I, Timothy Kirkhope, was commissioned by Metaluxe to create photomontages of the proposed development from six locations identified by the Co-Respondents’ experts, to support their analysis and reporting. The vantage point locations selected by these experts are detailed in Section 6, Appendix 2 - Plans & Montages. 

 

Additionally, the Appellants’ expert Dean Butcher requested further photomontages from four extra viewpoints (VPG-VPJ). 3.4. A subsequent request was made for a second set of photomontages that incorporated the revised architectural proposal for the development. These secondary photomontages are referred to as ‘Revised Architecturals’ in Section 6, Appendix 2 - Plans & Montages. 

 

The process used to create the photomontages and represent the approved development within its surroundings is outlined below: 

a. Site visits were conducted on June 8 and July 25, 2022, to capture the necessary photographs. Draft images were taken from various locations requested by the Co-Respondents’ experts, using multiple focal lengths of 35mm, 50mm, for their review and selection. 

b. All photographs were captured at my eye level (1.75m). 

 

c. The experts reviewed the draft photo collection and chose the images that best supported their perspectives for reporting. d. Photographs were taken with a Canon RP camera (full-frame 36 x 24mm sensor) equipped with a 50mm lens. The photographic images were imported into Photoshop, where various reference control points from nearby buildings and features were selected. The photographs were overlaid with sequentially numbered reference points, which were then provided to the surveyor

 

Camera setup and rendering procedures take place within 3D Studio Max 2022 and Mirrored in Unreal Engine 5, to produce the final renderings for the photomontages.

Cameras were configured using the camera match utility, utilizing control point data supplied by the surveyor and reference imagery to assist the on-site survey team. Control points were aligned with the markers in the reference images, allowing the 3D model to be repositioned to match both the reference photograph and the actual site imagery.

The scene was lit using HDRI imagery taken on-site to create an authentic background and lighting simulation. This technique effectively positions the sun based on the project's location, time of day, and time of year, ensuring a realistic representation.

The 3D model was rendered with precise materials and shaders to achieve a realistic depiction of the final finishes. Shaders were designed for all building surfaces, including glass, concrete, steel, and 3D vegetation. These finishes were crafted based on the information and color palettes outlined in the Development Approval.

Digital renderings were imported into Photoshop v23.4.1 for compositing with vantage point photographs. The renderings of the proposed development were overlaid onto these photographs, with any unnecessary foreground elements removed from the base images.

A review was conducted of existing vegetation slated for removal as part of the development; this vegetation was digitally removed from the photographs. Additionally, any proposed landscaping not included during the 3D rendering phase was added in post-production to ensure accuracy.

General Information: The information provided on this website is intended for general informational purposes only. It should not be considered as professional advice or a substitute for seeking professional guidance.

·         No Warranty: [Business name] makes no representation or warranty, express or implied, regarding the accuracy, completeness, reliability, or availability of the content on this site. The use of the information is at the user’s own risk.

·         Not Financial, Legal, or Medical Advice: The content on this website does not constitute financial, legal, medical, or any other professional advice. Users should consult with the relevant professionals for specific advice related to their situation.

·         Third-Party Links: This website may contain links to third-party websites or content. These links are provided for convenience only, and VizImpact does not endorse, warrant, or assume liability for the content or practices of these third-party sites.

·         No Endorsement: The presence of any link or reference to a third-party website, product, or service does not imply an endorsement or recommendation by VizImpact.

·         No Guarantee of Results: VizImpact does not guarantee any specific results or outcomes based on the use of its products, services, or information provided on this website.

·         Copyright and Intellectual Property: All content, including text, images, logos, and graphics, on this website is the property of [Business name] and is protected by applicable copyright and intellectual property laws.

·         Changes and Updates: VizImpact may update, modify, or remove any information on this website without prior notice. It is the user’s responsibility to stay informed of any changes.

·         Indemnification: By using this website, users agree to indemnify and hold harmless VizImpact from any claims, damages, losses, or liabilities arising from their use of the site.

·         Governing Law: This disclaimer shall be governed by and construed in accordance with the laws of Australia, and any disputes arising out of or in connection with this disclaimer shall be subject to the exclusive jurisdiction of the courts in Australia

Experience and Qualifications

Timothy Kirkhope

Senior Architectural Visualiser / Publisher

E. tim@vizimpact.com.au

M. +61 451 119 669

Kardinia International College

Completed Y12 VCE in 1999

Achievements. 

1999 TER score of 86.9

1999 Study score of 50/50 Victoria Premier Award for Graphic Design

RMIT University Melbourne

• Product Design Diploma of Arts February 2000 - November 2003

Course Subjects

• Computer-aided design • Materials design • Industrial engineering • Drawing • Graphic arts • Human engineering • Production management • Manufacturing processes • Theory of design practice • Materials standards • Modelling • Plastics Design • Product design • Production engineering

Work experience placement with RMIT resulted in full time position offered at Buzz Products Richmond/Abbotsford - November 2003

• Texturing • Modelling • Rendering • Animation • Network Rendering • 360 Virtual Reality • Interactive Media • Realtime Environments • User Interface • User Experience • Cross Platform Publishing • App Store Publications • Vehicle and Character Physics • Environmental Lighting • Weather and Atmospherics 

• Conceptual Design • Sketching • 2D Illustration 

• 3D Architecture • Building Design • Product Design • Commercial Architectural Visualisation • Masterplan •  Landscape and Urban Visualisation

• Graphic Design & Presentation • Corporate Identity

 

METALUXE October 2022 – October 2024 

https://www.metaluxe.com.au/

ART DIRECTOR

Key Activities

Utilise the Unreal Engine toolset to produce high resolution imagery and large scale environments suitable for architectural image and video publication.

Scale project size and complexity with the best practices for optimisation. Assess limitations and opportunities in rendering speed, resource, and cost.

Understand how the business services can be smoothly integrated into exsisting platforms for property developers and marketing channels. Effectively use a still images to translate into animated visualisations.

Explore the effect of online digital content and viewer engagement, develop immersive visualisations, and communicate new approaches to the team to help manage and present their work effectively.

Publish online content including stills, video, VR, interactive or executables.

Managing scene creation of masterplan for architecture and natural environment. Monitor server, software or hardware limitations in order to maintain quality, initialisation speeds and playback frame rate.

 

ARM ARCHITECTURE MELBOURNE January 2018 – October 2022  

https://armarchitecture.com.au/

SENIOR ARCHITECTURAL VISUALISER

Key Activities

Ensure all images and animations are consistent, stylish and appropriate. Collate all material into a coherent presentation in various formats.

Communicate clear visions for design competitions for the creative arts, theatres and museums.

Ensure the presentation quality, standards and coherency across various design information.

Encourage and leverage creative talent from architects and designers for presentations. Train and mentor where necessary to adhere to excellent standards in visualisation and communication.

Create compelling visuals that communicate design concepts through different stages of commercial projects. Collaborate with a range of designers and technicians internally and externally.

 

CRONE PARTNERS MELBOURNE Architects January 2014 – January 2015 

http://crone.com.au/

Building Design and Visualization

Key Activities

Translating and interpreting architectural concepts in into a resolved 3d building design concepts.

Solve complex problems while working under engineering and budget limitations.

Manage the presentation content and collateral for design tenders and competitions.

3d visualization, real-time and 3d fly-through.

 

BATESSMART Architects September 2010- June 2013

https://www.batessmart.com/

3D VISUALISER

Key Activities

Construct Computer Aided Design (CAD) illustrations and animations for presentation.

Participate in the presentation of design proposals.

Work directly with architects, interior designers and landscape architects.

Create accurate 3D modelling, lighting and material studies from design information including images, architectural plans, rough sketches or real life objects.

Enhancing imagery in Photoshop

Create 3D fly-through animations.

Achievements

- Involvement in the successful bids in Docklands, Chadstone, Melbourne CBD, Queensland and Singapore

- Developed a non-destructive 3D visualisation work flow using Photoshop and After Effects.

 

HASSELL DESIGN STUDIO  October 2008 - September 2010

http://www.hassellstudio.com/

3D VISUALISER

Collaborate with the design team and relevant disciplines across the office to prepare and present design proposals using Computer Generated Images (CGI) to resolve functional, environmental and aesthetic requirements. 

To have the ability to produce photo-realistic images as well as possess artistic abilities that enable the production of evocative images and quick 3D studies from relatively unresolved design information.

Achievements

Involvement in the successful bids for Dandenong ATO, Bendigo and Adelaide Bank, University of Queensland’s AEB. 

 

TIME DEVELOPMENTS (TIME 2000)  July 2007 – October 2008

DESIGN AND MARKETING

Primary Objective

- Using standard 20ft and 40ft modular sized units, explore stylistic approaches for adoption into 22 sectors including mining, military, eco-tourism, aged care, medium to high density residential.

- Develop a Corporate Identification for the project venture.

- Design and develop websites, brochures and promotional DVDs capital raising.

 

CONTRACTS July 2006 – July 2007  London, UK.

Clients

Faulkner browns & Chong Partners (UK)

Bradley Dyer Group http://www.bradleydyer.com/ (UK) 

Korner Skin Care (UK)

 

BUZZ PRODUCTS June 2003 - July 2006

http://www.buzzproducts.com/

PRODUCT DEVELOPMENT

Buzz Products is a company based in Abbotsford offering complete product solutions for custom design premiums in FMCG, Airline, Cosmetics, Fast food, Alcohol, Clothing and Apparel.

Primary Objective

Design, develop, and improve new or existing products and direct the building and testing of prototypes.

Key Activities

- Research and report product standards to provide testing, Inspection and Certification for new products

- Liaise with clients in the product development stage and present design information at relevant stages.

- Create 3d presentations for competitions and project presentations.

- Generate manufacturing specifications for sample production.

 

3D Visualisation Enhance3D, EVOTR PTY LTD  January 2015 - 2018

CLIENT PROJECT

Crone Architects  295 City Rd, 1-9 Sackville St, 150 Lonsdale, 281 Springvale Rd, 230 Sussex St, Espace Middle Park, ANMF Melbourne, Lindfield, 175 Liverpool Street, Manningham St Parkville.

Beulah International  GardenHill Doncaster

Aesop Store counters and shops, Melbourne, Sydney, South Korea, Japan, NZ

Unispace  Melb/Sydney head office, UBS Melb/Sydney, HP Adelaide, Coles Melb Office, Dexus, General Electric, Biogen, Simplot Pilot, ISPT, Autodesk, Homebush, Celgene, 

WoodsBaggot Bayan Apartments 

EPC Pacific Port Adelaide GSO, Port Adelaide Waterfront

Fender Katsilidis  Glenwavery Mixed Use

PGOC Epping Shopping Center / 

Maike Design Studio Merville resi 

Eugene Cheah Concept Design  

Fiona Barker Design NewBay

AUSSIE4X4

Reaching top charts in 2019. No. 6 All Free Games, Apple Appstore and Google Playstore.
Aussie4x4 is an open-world vehicle simulation on mobile. Sourcing and expanding required skill base at different stages of development, publication and other source control, player progress backup and other server requirements.

http://aussie4x4game.com/

TRAXWORLD 

Experiential Project in EARLY ACCESS, Published on Steam

TraxWorld is an open-world third-person game crossed with an off-road vehicle sim. Exit vehicles in 3rd person, use character tools, collect items to sell from the pouch or collect your machines in the vehicle inventory.. Read more in store page

 

https://store.steampowered.com/app/1562340/TraxWorld/

CLIENT - PROJECT

Stockland Sunshine Coast - Aura Peoples Place

 

Wellington Council - The Wedge Performing Arts Centre

 

MAB Docklands - New Quay Lot14 

 

Arts Center Melbourne - Sidney Myer Music Bowl

 

City of Gold Coast - Home of the Arts Brisbane 

 

Vic School Building Authority - North Melbourne Hill Primary

 

Geelong Arts Center - Geelong Performing Arts Centre

 

RMIT - One Operations New Home

 

NGĀ KAKANO A RĒHIA - The Aotea Studios

 

Reshape - Caulfeild Village Precinct

 

National Museum Australia - Gallery Works Seaplane Port Upgrade

 

The GPT Group - Melbourne Central Building and Rooftop

 

Footscray Community Arts - Business Case Study

 

Wagga Wagga Civic Centre - Concept Theatre Masterplan

 

AFL - Marvel Stadium Upgrade

 

CDU Darwin - CBD Education Precinct 

 

Queensland Government - Australian War Memorial Redevelopment Program 

 

QLD Performing Arts Centre - Theatre Concept Presentation

 

Macquarie Park Masterplan  - Proposed Redevelopment and Mixed-Use Development

 

Vicinity Centres - Box Hill Vicinity Site Development Masterplan

 

Flinders St Station Upgrade - Concourse East Redevelopment 

 

Vicinity Centres - Bankstown Shopping Centre Masterplan Competition

 

Brisbane City - Woolloongabba Precinct renewal strategy competition

 

Pace Development Group - The Darley Flemington RaceCourse Luxury Residences

 

Victor Harbor - Arts and Culture Centre 

 

Victoria Arts Precinct - National Gallery Victoria Contemporary Design 

 

Adelaide Riverbank Precinct - Festival Plaza Redevelopment

 

The Victorian Civil and Administrative Tribunal originally refused the permit granted by the City of Stonnington Council in 2019, ruling it would cause too much pressure on Melbourne High School next to the site.

Melbourne High School

Landscaping

Jack Merlo has handled the landscaping which will create a connection between Chapel Street and the MHS main campus.

Past and Current Proposal Photomontage overlay

The photomontages showed the previous unsuccessful application with the current proposal, overlayed in different coloured transparent material.

aerial-enhanced aerial
default
default
default
default
pg2
default
default
default
pg1
default
white upload
aerial-enhanced aerial default default default default pg2 default default default pg1 default white upload

Photogrammetry Studies

Time-lapse shadow study animations

The project will be just a few doors down from Gamuda Land’s completed 661 Chapel Street tower, and the Royal Como, another mixed use tower at 663 Chapel Street.

Immediately north of the site is a four-level brick building which forms part of the MHS Campus, while immediately south is the new Centre for Higher Education Studies facility, a four-level education building